Tinsley Viaduct concrete repair and deck waterproofing

Tinsley viaduct was opened in 1967 as a key structure on the M1 motorway and remains a vital part of the UK’s motorway network.

The maintenance of Tinlsey Viaduct is the responsibility of Highways England and sits in Area 12 where Aone+ has the maintenance framework contract.

Aone + is a joint venture between Jacobs, Costain and Colas, and has embarked on a programme of refurbishment.

As part of the resurfacing work, Metrail Construction has been entrusted with the associated concrete repair and deck waterproofing.

Metrail’s product partner for the project is GCP Advanced Technologies, who supply the Eliminator waterproofing system that Metrail sprays onto the deck and Metaset used in concrete repair.

Work is progressing well and Aone+ has expressed their satisfaction with Metrail’s on-site performance and quality of workmanship.